Skip to main content
Hernando County, FL Banner Image
File #: 16663   
Type: P&Z Agenda Item Status: Agenda Ready
File created: 10/29/2025 In control: Planning & Zoning Commission
On agenda: 11/10/2025 Final action:
Enactment date: Enactment #:
Title: Conditional Use Permit Petition Submitted by BWR FL, LLC (CU2509)
Attachments: 1. CU2509 Staff Report, 2. CU2509 Application Packet, 3. CU2509 Site Plan, 4. CU2509 Maps
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

TITLE

title

Conditional Use Permit Petition Submitted by BWR FL, LLC (CU2509)

 

body

BRIEF OVERVIEW

Request:

Conditional Use Permit for a reconstituted Limestone Business

 

General Location:

North side of Cortez Boulevard approximately 3,539 feet from Treiman Boulevard

 

Parcel Key Number:

394086

 

Summary of Applicant’s Request:

The petitioner is requesting a Conditional Use Permit to operate a reconstituted limestone business on an active mining property owned by West Florida Aggregates. The proposed use will be located on 5 acres within a larger 544-acre parcel. The operation will include a 10,000-square-foot concrete pad where crushed limestone fines, cement, water, and compaction will be used to produce limestone blocks. A storage area will also be provided around the production area for loading and unloading, finished block and equipment.

 

The materials will be sourced by local quarry, which helps reduce transportation-related emissions. The finished products will be used in residential paving, building construction, and landscaping. These blocks offer improved thermal performance, contributing to energy savings in buildings. With a high Solar Reflective Index, they also help reduce the urban heat island effect. The products are durable, have a long lifespan, and reduce material waste and replacement costs. Additionally, they use less cement and water than traditional concrete masonry units, making them a more sustainable option.

 

FINANCIAL IMPACT

A matter of policy.  There is no financial impact.

 

LEGAL NOTE

The Planning and Zoning Commission has approval jurisdiction over the subject application.  The Applicable Criteria for conditional use approval are contained in Appendix A, (Zoning Code) Article V, Section 4.  The Conditional Use Approval must be consistent with the Comprehensive Plan.

 

recommendation

RECOMMENDATION

It is recommended that the Planning and Zoning Commission determine whether a need for a Temporary use permit exists; if such a determination is made, the Planning & Zoning Commission may approve the request for a Conditional Use permit for a reconstituted Limestone Business with performance conditions.