TITLE
title
Rezoning Petition Submitted by Maine Drilling and Blasting Inc (H2544)
body
BRIEF OVERVIEW
Rezoning Request:
Rezoning From AR2/ Agricultural Residential to PDP(HHC)/ Planned Development Project (Heavy Highway Commercial) for a Heavy Construction Service Establishment with deviations
General Location:
Southwest Corner of Lake Lindsey Road and Ponce De Leon Boulevard
Parcel Key Number:
75965
Summary of Applicant’s Request:
The petitioner is requesting a rezoning from AR-2 (Agricultural Residential) to PDP(HHC) - Planned Development Project (Heavy Highway Commercial) to allow for the development of a Heavy Construction Service Establishment, including outdoor storage and parking.
The proposed development includes the construction of a 20,000-square-foot building, along with associated outdoor storage areas and parking. The business is an engineering and construction services company specializing in drilling and geotechnical work for construction projects, roadways, foundations, and mining operations. The company also provides fabrication and maintenance of drilling equipment and intends to use this site for those operations.
Due to the unavailability of centralized potable water and wastewater services, the site will be served by a private well and septic system.
FINANCIAL IMPACT
A matter of policy. There is no financial impact.
LEGAL NOTE
The Planning and Zoning Commission has jurisdiction to make a recommendation on the subject application. The Applicable Criteria for a Zoning District Amendment are contained in Appendix A, (Zoning Code) Article VI. The Applicable Criteria for Planned Development Projects are contained in Appendix A, (Zoning Code) Article VIII. The Zoning District Amendment to the Planned Development District and applicable PDP master plan must be consistent with the Comprehensive Plan.
recommendation
RECOMMENDATION
It is recommended that the Planning and Zoning Commission recommend the Board of County Commissioners adopt a resolution approving the petitioner’s request for a Rezoning from AR2/ Agricultural Residential to PDP(HHC)/ Planned Development Project (Heavy Highway Commercial) for a Heavy Construction Service Establishment with deviations with performance conditions.