File #: 14158   
Type: Resolution Status: Agenda Ready
File created: 6/10/2024 In control: Board of County Commissioners
On agenda: 7/9/2024 Final action:
Enactment date: Enactment #:
Title: Proposed Resolution Adopting Revised Rates, Fees and Charges With 5-Year Phase In for Water and Wastewater Utility Services Provided by Water and Sewer District
Attachments: 1. 2024 Water and Wastewater Rate and Charge Study Presentation, 2. 2024 Water and Wastewater Rate and Charge Study, 3. Rate n Fees Resolution No. 2009-121 Connection Fees Included, 4. Notice of Public Hearing, 5. Final Rate Resolution 2024, 6. Resolution No. 2019-151, 7. Affidavit of Legal Ad Publication CLK24-082, 8. Approved Resolution No. 2024-155
TITLE
title
Proposed Resolution Adopting Revised Rates, Fees and Charges With 5-Year Phase In for Water and Wastewater Utility Services Provided by Water and Sewer District

body
BRIEF OVERVIEW
Raftelis, an independent water and wastewater rate consultant, completed a water and wastewater rate study and miscellaneous service fee analysis of the Hernando County Water and Sewer District's (HCUD) water and wastewater rates, fees, miscellaneous charges, and connection fees on March 4, 2024. The study resulted in the following conclusions:
The Raftelis study, which encompassed the five (5) fiscal year period 2025 - 2029, recommends the following:

1. The existing monthly water and wastewater user rates, fees, and miscellaneous charges were established by Resolution 2019-151 for fiscal years 2020 - 2024 and Section 7 of Resolution 2009-121 which established water and wastewater connection fees. The new Resolution adopting revised rates, fees, miscellaneous charges, and connection fees for water and wastewater utility services will repeal these two resolutions.

2. The existing monthly service rates, fees, miscellaneous charges, and connection fees are not projected to be adequate to fund the expenditure and funding needs of the HCUD utility system during the 5-fiscal year period from 2025 through 2029, including the funding of the capital program.

3. The existing water minimum billing charges and consumption charges should be increased to produce the following percentage increases in rate revenues:

Fiscal Year 2025 - 7.0%
Fiscal Year 2026 - 7.0%
Fiscal Year 2027 - 7.0%
Fiscal Year 2028 - 3.5%
Fiscal Year 2029 - 3.5%

4. The Fiscal Year 2025 consumption charges include increased water conservation pricing incentives for higher water use customers. Rates are recommended to be adjusted uniformly for the remainder of the 5-year period.

5. The existing wastewater minimum billing charges and consumption rates should be increased uniformly to produce the following ...